Project Challenge
Many deep gold mines struggle with limited shaft space, high power cost and heavy maintenance using conventional hoisting or truck haulage. This underground gold mine needed reliable ore lifting up to 255 m height, with a target capacity of 200 TPH under low temperature and harsh underground conditions. Our team took on the full EPC delivery for this vertical continuous conveying system.
| Project Specifications | |
| Material | Gold ore |
| Handling Capacity | 200 TPH |
| Belt Speed | 2 m/s |
| Lifting Height | 255 m |
| Conveying Angle | 90° Vertical |
| Belt Type | S240 B1200 TC220 ST6300 |
What We Delivered
Full turn key EPC scope includes:
- Sidewall conveyor and custom made vertical sidewall belt
- Auxiliary transfer flat belt conveyors
- Complete on site assembly and installation
- System commissioning and performance test run
- Long term on site support and maintenance contracts‘
Real world Project Benefits
As one of China’s first operational 255 m vertical mine lifting systems, this setup supports sustainable green mining goals.
- On site vertical transport efficiency increased by over 10 times against old hauling methods
- Overall spending on capital investment, energy consumption and routine maintenance cut by 30% 60%
- Site safety, energy saving performance and production efficiency all achieved in one integrated system
Key Technical Breakthroughs
Our engineering team overcame multiple deep mine operational pain points:
- Custom belt selection and structural design for strict 90 degree vertical lifting
- Mining spec belt with flame retardant, cold resistant and high adhesion properties
- Anti build up structure for clean, high efficiency material discharge
- Stress relief design for high tension bend sections
- On site spillage control and anti misalignment solutions for vertical sections
- Optimised mechanical and belt performance to sustain low temperature operation
- Fast installation concept built for narrow 3 metre mine shaft
- Special protection processes for installing the heavy 70 ton conveyor belt