• Specialised belting

    in high level market.

    View more
  • Professional

    conveyoring solutions.

    View more
  • Belt design and

    full life circle service.

    View more
  • Short delivery time,

    competitive price.

    View more
  • Strong teams with

    rich experiences.

    View more
QBF sidewall belt installed for China Tunnel Project
2022/09/16

(Summary description)

In tunnel excavation, the operational efficiency of TBM excavation determines the efficiency of the overall construction. It is widely used in railway tunnel engineering, subway tunnel engineering and other fields. With the improvement of TBM equipment manufacturing capacity, the excavation speed and the amount of slag removal are doubled. Construction costs and complexity continue to increase. How is the waste slag better transported to the ground?

QBF sidewall belt for steep inclined & vertical conveying has become a better choice, and its use can improve the speed of tunneling and achieve continuous multi-range tunneling.

----- Qingdao Metro

Material: Clay/Sand  Speed: 2.15m/s  Capacity: 800TPH

In tunnel excavation, the operational efficiency of TBM excavation determines the efficiency of the overall construction. It is widely used in railway tunnel engineering, subway tunnel engineering and other fields. With the improvement of TBM equipment manufacturing capacity, the excavation speed and the amount of slag removal are doubled. Construction costs and complexity continue to increase. How is the waste slag better transported to the ground?

QBF sidewall belt for steep inclined & vertical conveying has become a better choice, and its use can improve the speed of tunneling and achieve continuous multi-range tunneling.

----- Qingdao Metro

Material: Clay/Sand  Speed: 2.15m/s  Capacity: 800TPH

Awesome! Share to: